Initializing PMs
Overview
This page gives instructions, and an example of how to initialize PMs for configuration-managed Assets using the Maximo Integration Framework (MIF).
The example below gives examples of how to intialize preventive maintenance (PM) records for configuration-managed assets. Initialising a PM involves setting when it was last completed (if applicable) and when it is next due. Peforming this action through the MIF enables a bulk initialisation of PMs, for example when a new asset is brought into service and many PMs are created automatically.
The example includes data to intialise the calendar based 12 month inspection and also the meter based overhaul PMs for the bogies within the train.
Rapid Transit Metro Train - Intializing PM example
Download Initialising PMs Example - MXLoader
An explanation of the individual data elements and worksheets contained within the MXLoader file is described below.
| Field | Description |
|---|---|
| MASTERPM and PMNUM | The parent asset number of the position. Required for both installation and removal transactions. In the case a Master PM is specifed the system will use the combination of Asset number, Master PM number, and Site ID to uniquely identify a PM record. |
| ASSETNUM | The asset number of the configuration-managed asset. |
| LASTCOMPDATE | The date at which the PM last completed. This is optional. |
| PLUSANEWNEXTDUEDATE | The date and time at which the PM is next Due. This is an optional value for calendar based PM frequencies. If the Next Due Date is not specified then the system will calculated this by adding the PM time based frequency to the Last Completion Date to determine the Next Due Date. |
| PMMETER.METERNAME | The Meter Name for a PM with a meter based frequency. |
| PMMETER.PLUSANEWLASTDONECOUNT | The meter total for the asset at the point the PM was last completed. |
| PMMETER.PLUSANEWNEXTDUECOUNT | The meter total at which the PM is next due for the asset. If this is not specified the system will use the meter total at last completion + PM Meter frequency to determine the next due count. |